Protecting workers, communities, landowners, and the environment is a core part of how the Desert Southwest Project is planned, built, and operated. Safety considerations are integrated into every stage of development, from engineering and construction to long-term operations and maintenance.
Planning for Safety From the Beginning
Safety planning begins long before construction starts. Project teams evaluate engineering requirements, environmental conditions, land-use considerations, and regulatory requirements to identify and address potential risks before work begins.
Federal and state agencies review project plans, permitting requirements, and construction activities as part of the overall approval process.
Protecting Workers, Landowners And Communities
Construction activities are conducted in accordance with established safety procedures designed to protect workers, nearby communities, landowners, and the public.
Contractors and project personnel are expected to follow safety requirements, training programs, and operational procedures throughout construction.
-
New pipeline infrastructure
Construction personnel receive safety training specific to their responsibilities and work environments.
-
Environmental Protection
Construction practices are designed to minimize impacts to surrounding land, water resources, and wildlife habitat.
-
Community Coordination
Project teams coordinate with local agencies and stakeholders regarding construction activities and schedules.
Built For Safe, Reliable Operations
Once operational, the Desert Southwest Project would be monitored, maintained, and operated in accordance with federal pipeline safety regulations and industry standards. Routine inspections, integrity management programs, and ongoing maintenance activities help support safe and reliable operation.
Emergency Preparedness
Emergency preparedness is an important part of pipeline operations. Emergency response plans are developed in coordination with local emergency responders and relevant agencies.
These plans help ensure clear communication, defined response procedures, and coordinated action if an incident occurs.
- Emergency response planning
- Coordination with local responders
- Training and preparedness exercises
- Ongoing review and updates
About The Desert Southwest Project
Explore project details, review the proposed route, and stay informed as the regulatory review process continues.
View The Project
More Than a Pipeline
See how the project creates jobs, strengthens energy reliability, and supports local communities.
See the BenefitsProject Q&A
What safety measures and emergency protocols are in place to prevent and respond to a pipeline incident?
Natural gas transmission pipelines are engineered with multiple layers of prevention and rapid response systems. They are built with high-strength materials, corrosion protection, and 24/7 monitoring systems that detect pressure or flow changes. Remote-operated and automatic valves can quickly isolate sections if a leak is suspected, while regular inspections, “smart pig” scans, and preventive maintenance help catch issues early.
We maintain detailed emergency response plans, including rapid shutdown procedures, public communication, and joint drills with local first responders. Public education and clear right-of-way signage further support quick reporting and safe community response.
Together, these design standards, monitoring technologies, and coordinated emergency plans are intended to protect people, property, and the environment.
Accidental damage from excavation is one of the biggest risks for pipeline operators. To prevent this, always call 811 before you dig near a pipeline. While pipeline leaks are rare, in the unlikely event one occurs, immediately call 911 and the company. We will then dispatch trained personnel to the site.
How will the pipeline construction affect my crops and trees?
We work to minimize any impact on your property. We avoid mowing or clearing cultivated fields, and once construction and restoration are complete, you can continue farming the land as before. However, federal regulations require us to periodically mow or clear the right-of-way to maintain a clear visual line of sight for aerial inspections. Farmers will be compensated for crop loss related to the construction of the pipeline.
How far from a compressor station can noise be heard?
Compressor stations along the pipeline will adhere to the Federal Energy Regulatory Commission’s (FERC) regulations, which mandate that the average noise level from a compressor station does not exceed 55 decibels at the pre-existing nearest noise-sensitive areas, such as homes, schools, and hospitals. For context, a normal conversation is also around 55 decibels, while an automobile at 50 feet can generate noise up to 90 decibels.
How close to homes can pipelines be built?
Pipelines are typically located well away from residences. The specific required distance can vary depending on federal, state, and local regulations, as well as the terms of the easement agreement. For natural gas transmission lines, the recommended minimum distance from a house is typically 50 feet. Any new structures must be built at least 25 feet away from the centerline of the Desert Southwest Expansion Pipeline, remaining clear of the 50-foot wide permanent easement.